Road Infrastructure
Various Motorway Works
Tuscany — Autostrade per l'Italia2018–2023
All projects
After
Before
Area
Interventi multipli
Duration
Multi-year
Client
Autostrade per l'Italia
SOA category
OG3 / OS28 — Works and structural upgrades
The challenge
Carrying out structural upgrades and extraordinary maintenance on infrastructure in service, ensuring safety and continuity of motorway traffic.
The solution
Scheduled works on canopies, pylon plinths and arched structures, with site organisation compatible with the operation of the network.
Site phases
- 01
Works scheduling
Planning works compatible with the operation of the motorway network.
- 02
Structural upgrades
Works on pylon plinths and structural reinforcement.
- 03
Extraordinary maintenance
Restoration of station canopies and arched structures.
- 04
Checks and testing
Final checks on the safety of in-service infrastructure.
Before / After
Drag to compare the initial state with the result of the works.
Gallery
Do you have a project of value?
We bring the same certified standard of our public works to private clients. Tell us about your project: let's discuss it together.
Discuss your project